SPONSORED RESEARCH PROJECTS
S No |
Sponsoring Agency |
Title of Project |
Amount of Grant |
Duration |
PI/CI |
14 |
German
Research Foundation |
Effective
contaminant source geometries and their implications for final plume
extension |
Euro
285000 |
3 years (2018 to 2021) |
Collaborative |
13 |
MoWR |
Climate
Change Impact Studies for Rajasthan (Area of Inland Drainage and Mahi basin) |
14.00
Lacs |
3 years (2018 to 2021) |
Collaborative |
12 |
Indo-German |
Monitoring
& Management of Urban Flooding using a Crowd-sourcing Technique -
FloodEvac |
46.39
Lacs |
3 years (2014 to 2017) |
Collaborative |
11 |
MoWR |
Water
Resources Studies of Large Basins |
16.78
Lacs |
3 years |
Collaborative |
10 |
DST |
Regional
Scale Hydrological Modeling for Climate Change Impact Assessment |
14.22
Lacs |
3 years |
Dr
Dhanya CT |
9 |
MoES |
Unified
Model Component IV: Land Surface Processes |
15.92
Lacs |
5 Years |
Collaborative |
8 |
MoEF |
Water
Resources: Ganga River Basin Management Plan |
60.5
Lacs |
2 Years (2013 to
2015) |
Collaborative
– IIT Consortium |
7 |
French
Govt CMIRA-PRO (2010-2011) |
Evaluation and Simulation of Alternative Devices for
Control of Storm Water Runoff in Urban and Suburban Area |
26000 euros |
9 Months |
Collaborative
(IISc, ESME, St Etienne) |
6 |
ICMR |
Evidence based assessment of biophysical determinates
of malaria in the northern states of India & development of framework for
adaptation measures for malaria control under climate change scenarios |
24.2
Lacs |
5 Years |
Collaborative |
5 |
DST |
Experimental
Investigation in Slurry Pipeline for Near-wall Lift of Particles |
27.31
Lacs |
2 Years (6/ 2009 to 6/2011) |
Dr
DR Kaushal |
4 |
NSSL |
Suitability
of the IITD Geomembrane for Canal Lining with Swelling Soil Conditions |
12.57
Lacs |
1 Year |
Prof
BL Deopura |
3 |
MoWR |
Evaluation
of Geomembrane for Canal Lining |
31.94
Lacs |
3 Years (3/2009 to 3/2012) |
Prof
BL Deopura |
2 |
DST |
Optimal Spacing of Open Channels for Recharging Groundwater Artificially |
6.48 Lacs |
3 Years |
PI |
1 |
AICTE |
Seepage from Canals |
Salary + 3.00 Lacs |
3 Years (10/2001 to 9/2004) |
PI |
SPONSORED CONSULTANCY PROJECTS
S. No |
Organization |
Title of the Project |
Year |
CI |
31 |
Jubilant Ltd |
Review of Proposed
Measures for Remediation of Subsurface Contamination at Site of Jubilant
Plant, Nira, Pune District |
2016 |
Jointly |
30 |
NOIDA Authority |
Main Drain along 45m
wide road in front of Sector-146 to Sector 148 Pusta Noida |
2016 |
Jointly |
29 |
SPML, New Delhi |
Surge Analysis of 1500
ID MS Water Pipeline for Fatehpur-Laxmangarh Package 6 |
2016 |
Single |
28 |
Haryana Housing Board |
Assessment of Bank
Stability and Bank Protection Measures in respect of River Kaushalaya d/s of
Kaushlya Dam, Panchkula, Hariyana |
2016 |
Jointly |
27 |
SPML, New Delhi |
Surge Analysis for
Clarified Water Make Up Water system, etc for Korba Super Thermal Power
Project, Stage III,(1x500MW) NTPC |
2015 |
Single |
26 |
MEIL-JYOTHI-JV and
Sardar Sarovar Narmada Nigam Limited |
CFD Analysis for Small
Hydro Power Plants at three Locations on Saurashtra Branch Canal of SSNNL |
2014 |
Jointly |
25 |
OM-Metal Infra Ltd and
Sardar Sarovar Narmada Nigam Limited |
CFD Analysis for Small
Hydro Power Plants at Three Locations on Kachch Branch Canal of SSNNL |
2014 |
Jointly |
24 |
Unitech Machines |
Surge Analysis for Makeup Water system etc for Barh Super Thermal Power Project – Stage II NTPC |
2013 |
Single |
23 |
McNally Bharat Engg Co Ltd |
Mathematical Model study of desilting basin for project Ganga water supply package for Barauni Thermal Power Project – Phase I & Phase II NTPC |
2013 |
Single |
22 |
DLF
Ltd |
Dewatering
issue in DLF Mall of India, Noida |
2012 |
Jointly |
21 |
Enviro
Engineers, New Delhi |
Checking
& Vetting of Hydraulic Process & Unit Sizing Design and Structural
Drawings of 16 MLD STP at Rewari |
2012 |
Jointly |
20 |
Govt
of NCT, Delhi |
Drainage
Master Plan of NCT |
2012 |
Jointly |
19 |
Municipal Corporation Chandigarh |
Analysis of Hydraulic Design for Replacement and
Augmentation of Trunk Brick Sewer by RCC NP3 Pipes in UT Chandigarh |
2012 |
Single |
18 |
Technofab Engineering Ltd |
Surge Analysis
for AWRS for NTPC, Vindhyanchal Super Thermal Power Project –IV at
Singarauli, MP |
2012 |
Single |
17 |
Technofab Engineering Ltd |
Transient
Analysis for Pipeline for AWRS for NTPC, Nabinagar Thermal Power
Project |
2012 |
Single |
16 |
Denfab Engineers, New Delhi |
Surge Analysis of 13 km long Raw Water Pipeline from Intake Wll Pump House to Power Plant for Jhabua Poer Ltd |
2012 |
Single |
15 |
GVK Projects & Technical Services Ltd |
Assessment of Design Discharges and Stages in Sabarmati River at the Proposed Road Bridge at Galiyana on SH:8 from Bagodra to Vasad in Gujarat State |
2012 |
Jointly |
14 |
Govt
of Kerala |
Water
Balance Study of Wembnad Wetland System |
2011 |
Jointly |
13 |
Yamaha
India Ltd |
Analysis
and recommendation for adequacy of drainage system and sustainability of groundwater
at India Yamaha Motors Pvt Ltd, Faridabad |
2011 |
Single |
12 |
CPWD |
Groundwater
Table Position at Construction of Indira Gandhi National Centre for Art and
Culture (IGNCA) Building at Dr Rajender Prasad Bhawan, New Delhi |
2011 |
Single |
11 |
SPML,
New Delhi |
Surge
Analysis for 1200 mm OD HDPE Pipeline (Rising Main) for 53.5 MGD Preet Vihar
Sewage Pumping Station |
2011 |
Single |
10 |
Enviro
Engineers, New Delhi |
Checking
& Vetting of Hydraulic Process & Unit Sizing Design and Structural
Drawings of 13 MLD STP at Ajmer and 3.5 MLD STP at Pushkar |
2011 |
Jointly |
9 |
SPML,
New Delhi |
Surge
Analysis for NBCC Faridabad PSC/MS Pipe Project Package 7 and Package 8 |
2010 |
Single |
8 |
Enviro
Engineers, New Delhi |
Checking
of Hydraulic Process Design and Structural Drawings of 2.1 MLD CETP for
proposed Textile Centre Scheme at Pilkhua |
2009 |
Jointly |
7 |
Technofab
Engineering Ltd |
Surge
Analysis for Pumping of Water from Mallinger Pump House to Screening Plant
Reservoir at Bailadila Iron Ore Project |
2009 |
Single |
6 |
ICRA
Management Consulting Services Ltd |
Expert
Advise for Preparation of Terms of Reference for the DPR for Stormwater
Drainage and Sewerage cum Effluent Network at Baddi, HP |
2007 |
Jointly |
5 |
Gammon
India Ltd |
Surge
Analysis for 1524 OD MS Pipe line for the Raw water system to DVC
Mejia Project in West Bengal |
2007 |
Single |
4 |
SPML,
New Delhi |
Surge
Analysis for DI Pipeline of 35 MLD CETP, Bawana, Delhi |
2006 |
Single
|
3 |
SPML,
New Delhi |
Surge
Analysis for 1578 dia twin Rising main MS Pipeline for 90 MGD EPS Pumping
Station at Yamuna Vihar, Delhi |
2006 |
Single |
2 |
Vikas
Associates, Korba |
Technical Approval of Design and Drawing of Cross
Regulating Gate at Intake Canal of CSEB, Korba East |
2006 |
Single |
1 |
PHED, Govt. of Rajasthan |
Design of Cross Drainage Works for Rajiv Gandhi Lift Canal |
1997 |
Jointly |