| Sr.No. |
Project Title |
Amount |
Sponsor |
Period |
Status |
Position |
|
Performance based design of geosynthetics reinforced soil (GRS) walls and bridge abutments for high speed railways (HSR) subjected to seismic loading |
Rs.14.89 Crore |
National Technical Textile Mission, Ministry of Textile, GoI |
2023-2026 |
Ongoing |
Co-PI |
|
Generation of Database of Reinforced soil wall failures for quality control |
Rs.55 Lacs |
MoRTH, GoI |
2021-2024 |
Ongoing |
PI |
|
Development of suitable design of bridge transition system for 25T and 32.5T axle load for freight (up to 100 kmph)and passenger traffic (up to 160 kmph) for Indian Railways |
Rs.1.49 Crores |
RDSO, Ministry ofRailways |
2021-24 |
Ongoing |
Co-PI |
|
Performance study of geocell reinforced road pavement at Dholera Activation Area |
Rs. 80 lacs |
Dholera IndustrialCity Development Limited |
2020-2023 |
Ongoing |
Co -PI |
|
Real-time measurement and assessment of ground vibrations induced bymetro and high-speed trains moving over elevated viaducts |
Rs.69.1 lacs |
Science andEngineering Research Board, SERB, DST, Govt. of India |
2020-2023 |
Ongoing |
Co-PI |
|
Performance and Design evaluation of test tracks of flexible pavementswith waste materials in subbase and base layers |
Rs. 1.83 Crores(IITD Share 22 lacs) |
TSDP, DST |
2016-2020 |
Complete |
PI |
|
Experimental Investigations and analysis of geosynthetics reinforced railway tracks laid on clayey subgrade |
Rs.32 lacs |
SERC, DST |
2016-2013 |
Complete |
PI |
|
Analysis and model tests on granular pile group - mat-soft soil foundation reinforced with and without geosynthetics |
Rs.15.4 lacs |
SERC, DST |
2012-2009 |
Complete |
PI |
|
Numerical modeling of Railway tracks on compacted subgrade |
Rs.44 lacs |
SERC-DST, RDSO and CSMRS |
2008-2005 |
Complete |
PI |
|
Coupled Three-dimensional Thermo-hydro-mechanical analysis of underground nuclear repositories |
Rs.15.7 lacs |
BARC |
2009-2008 |
Complete |
Co-PI |
|
Thermo-hydro-mechanical analysis of nuclear repositories |
Rs.5.70 lacs |
BARC |
2006-2005 |
Complete |
Co-PI |
|
Testing and Constitutive modeling of rocks |
Rs.14.2 lacs |
SERC-DST |
2008-2004 |
Complete |
Co-PI |
More than 100 consultancy projects are completed. Some of these completed in last few years and some presently ongoing are listed below:
| Sr. No |
ProjectTitle |
Agency |
Amount(in lacs) |
|
Consultancy and Review works including Site visits and AERB meetingsfor ground improvement works GHAVP 1 and 2, NPCIL, Gorakhpur, Haryana(2018) (as CI) |
ITDC, Mumbai |
122 |
|
Remodelling of the Initial 50 km Water SupplyConveyance System (GWS Channel/Pipeline System) (as Co-CI) (2022) |
Irrigation and Water Resources Department, Haryana |
100 |
|
Preparation of preliminary report on transfer of water from NCR watersupply channel through pipeline along KMP expressway from Baoli area to MewatArea of Haryana (as Co- CI) (2017) (FITT) |
Irrigation and Water Resources Department, Haryana |
60 |
|
Geotechnicalinvestigations and determination of liquefaction potential at Gautam BuddhaUniversity, Greater Noida (as CI) (2013) |
GNIDA,Greater Noida |
44.45 |
|
Recommendation of support measures for hill slopesat Pakyong Airport, Sikkim. (2019) (as CI). |
Airport Authority of India |
25 |
|
Construction of East Campus of Guru Govind Singh IndraprasthaUniversity at Surajmal Vihar, Shahdara, New Delhi (as CI) (2015) |
Guru Govind Singh Indraprastha University |
24.72 |
|
Raw Water Reservoir Consultancy Work (as CI) (2015) |
Talwandi Sabo PowerLimited, Vedanta Group |
20.52 |
|
Finite element analysis of Agra water supplyproject and vetting of design (as CI) (2014) |
NJSConsultant Company, Japan. |
16.85 |