About me | Research Publications | Experimental set - up|
Ph. D. Guided | M. Tech. & B.
Tech. Projects Supervised | Short Term Courses, Conferences,
Seminars and Workshops Attended |
R&D and
Consultancy
Projects Handled | Published Testing Reports |
Slurry Pipeline Design Software
Welcome to Kaushal's pages
R&D Projects
Handled: 6
R&D Projects
completed as PI: 3
S.No. |
Project Title |
Sponsoring Agency |
Year |
Amount (Lakh Rs.) |
1 |
Experimental investigation in slurry pipeline for near wall lift
of particles |
Department of Science and
Technology, Govt. of India |
2012 |
27.31 |
2 |
Experimental investigation and CFD modeling
of particulate transport to design invert trap for sewer solids management |
IIT Delhi |
2006 |
5 |
3 |
Infrastructure Development for Research Collaborations in the
Field of Ash Disposal Pipelines |
IIT Delhi |
2006 |
1 |
Total |
33.31 |
R&D Projects
completed as Co-PI: 3
S.No. |
Project Title |
Sponsoring Agency |
Year |
Amount (Lakh Rs.) |
1 |
Water Resources: Ganga River Basin Management Plan |
MoEF, Govt. of India |
2015 |
60.5 |
2 |
Monitoring & Management of Urban Flooding using a Crowd-sourcing Technique |
International Div., Dept. of Science & Techn. Germany |
2019 |
40.4 |
3 |
Collecting Particulate Matter in air using filters placed on the top of a moving car |
Department of Science & Technology, India |
2019 |
88.4 |
Total |
189.3 |
Consultancy Projects Handled: 52
49 (As Consultancy In-charge)
S.No. |
Project No. |
Project Title |
Sponsoring Agency |
Year |
Amount (Lakh
Rs.) |
1 |
CW15540 |
Study & designing of 2.3 km tailing paste pipeline |
JSW Steel Limited |
2022 |
5 |
2
|
CW15520 |
Improvement / modification etc. of junction of NDMC Brick Arch Barrel with Sunharipul Nallah adjacent to Dayal Singh College at Lodhi Road. |
NDMC Delhi |
2022 |
10 |
3
|
CW15483 |
Impact assessment analysis on the sub-soil water level |
Young Builders Private Limited, Delhi |
2022 |
5 |
4
|
CW15419N |
Calibration of Orifice Plate and Calibration of Pitot Tube |
Usha Filters Private Limited, Meerut |
2021 |
0.5 |
5
|
CW15411N |
Testing of Slurry Samples at IIT,Delhi for Pipeline Simulator Software and Analytical Support |
ArcelorMittal Nippon Steel India Limited, Chhattisgarh |
2021 |
2.8 |
6
|
CW15374G |
Study of Hydraulic Behavior of Hindon Cut Canal After being Crossed by Proposed Delhi-Ghaziabad-Meerut RRTS Corridor at Two Location Near Chilla Regulator & Kondli Bridge |
National Capital Region Transport Corporation, Delhi |
2021 |
10 |
7
|
CW15365N |
CFD Analysis of Scour Depth |
Charu Infra Engineering Consultant, New Delhi |
2021 |
5 |
8
|
CW15362G |
Study of Scouring and Vetting of Proposed Restoration Work Between Gate No. 17-22 in D/S of Okhla Barrage at Yamuna River in Delhi |
Head Works Division Okhla UP, Ghaziabad |
2021 |
10 |
9
|
CW15307N |
Proof Checking of Design for GeoSpray (Geopolymer) Based Rehabilitation of 900mm Dia x 447m Sewer Line at Sector 1 to Sector: 6,7 &9 Crossing under EE(C) Dwarka Road No. 224, Delhi |
Fathom Driller, Delhi |
2021 |
3 |
10
|
CW15023 |
Analysis & design of Surge Control System / Transient Analysis for the Design Flow for Pumping Mains |
Shree Hari Infraproject Private
Limited, Jaipur |
2020 |
5 |
11
|
CW14644 |
CFD for Pariyayantra filters |
Manav Rachna Educational Institutions |
2019 |
3 |
12
|
CW14640 |
65 Km slurry pipeline rerouting - Hydraulic engineering study
and support in its incorporation to the existing pipeline |
Essar Steel India Ltd. |
2019 |
5 |
13
|
CW14332 |
Proof Checking of Mathematical Model Studies for scour depth of
bridge substructure, using HEC-RAS software for Three Railway Bridges |
Rail Vikas Nigam Limited (A Government of India Enterprise),
Delhi |
2018 |
9.95 |
14
|
CW14155 |
Proof Checking of Scour Depth Study for DFCC Bridge over River Tonse |
GIL-SIL JV (GMR Infrastructure Ltd and SEW Infrastructure Ltd
Joint Venture) |
2017 |
3.5 |
15
|
CW14141 |
Surge analysis for transmission line from high lift pump house
to master balancing reservoir at rukungiri water
supply and sanitation project, uganda |
Noun Design Innovation (P) Ltd. |
2017 |
1 |
16
|
CW14104 |
Surge Analysis and Design for protection against surge pressure
for pipeline for NGWS project for 263 villages |
Gammon India Limited |
2017 |
2 |
17
|
CW14097 |
Studies on rheological properties and static settling
concentration of the coking coal slurry and pipeline transportation |
JSW Karnataka |
2017 |
3 |
18
|
CW14100 |
Proof checking/Design audit for Hydrology calculation of major
bridge no. 356, 359, 363, 365 & 366 on DFCCIL Track |
DFCCIL, A govt. of India Enterprises |
2017 |
2 |
19
|
CW13764 |
Surge analysis for pumping mains for Rajsthan
projects namely PHED Pokaran & PHED Jawai |
Technofab Engineering Limited, Delhi, India |
2016 |
4 |
20
|
CW13668 |
Mathematical Model Study for Desilting Basin – NTPC Gadarwra Project |
Kirloskar Brothers Limited, Pune India |
2016 |
3 |
21
|
CW13284 |
Evaluation and Strengthening of TSPL Plant Drainage System |
Talwandi Sabo Power Ltd.,Punjab,
India |
2015 |
14.17 |
22
|
CW13263 |
Surge Analysis and Design of Thrust Block of Providing Water
Supply Scheme |
Brij Gopal Construction Co. Pvt. Ltd.
Delhi, India |
2015 |
2 |
23
|
CW12904 |
Rheology Testing of Flyash for
Domestic Coal Ash |
Adani Power Ltd., Maharashtra India |
2014 |
1 |
24
|
CW12783 |
Providing Hydraulic Analysis & Basic Design for Iron Ore
Concentrate Slurry Pipeline from Bailadila Via Nagarnar To Vizag |
MECON Limited, New Delhi, India |
2013 |
4.45 |
25
|
CW12636 |
Determinaton of Rheological
Properties (Yield Stress Viscosity Value, Specific Gravity & Particle
Size Distribution |
Brahmani River Pellets Ltd., Odisha, India |
2013 |
0.75 |
26
|
CW12547 |
Vetting of ASH Dyke No.1 Raising for 2x135 MW Thermal Power
Plant |
ACB (India) Limited, Gurgaon, India |
2013 |
1.25 |
27
|
CW12541 |
Mathematical Model Study of Desilting Basin for Project: Ganga
Water Supply Package for Barauni Thermal Power
Station |
McNally Bharat Engineering Company Limited, Kolkata |
2013 |
2.5 |
28
|
CW12501 |
Vetting of Box Culvert Design for Barapulla
Nallah |
Sh. Rajinder Kumar Kaushik, Delhi, India |
2013 |
0.6 |
29
|
CW12354 |
Vetting of ASH Dyke Drawing / Documents for ASH Dyke No.2 at Deogon for 2x135MW TPP |
ACB (India) Limited, Gurgaon, India |
2012 |
1 |
30
|
CW12334 |
Rheology And Other Bench Scale Testing of Flyash
And Bottom Ash for Domestic and Blended Coal Ash |
ADANI Infra (India) Ltd, Ahmedabad, India |
2012 |
4 |
31
|
CW12238 |
Design of Iron Ore Slurry Pipeline |
McLellan and Partners Ltd, Surrey, United Kingdom |
2012 |
15.14 |
32
|
CW12140 |
Review of Structural Design of RCC Wall for Aravali
Bio-Diversity Park Near Vasant Vihar |
D.D.A. O/o the Exe.Engr.South
West Div.No.1,Delhi |
2012 |
1.06 |
33
|
CW11524 |
Design of 9.5 KM long Iron Ore Slurry Pipeline |
Mineral & Metal Technologies. Visakhapatnam, India |
2010 |
7.25 |
34
|
CW11394 |
Design of 450 KM Long Iron Ore Slurry Pipeline from Bailadila
(Chhattisgarh State) to Vizag (A.P.) |
MECON Limited, Delhi, India |
2010 |
23.5 |
35
|
CW11317 |
Field Study of Food Storage Godowns
for Collecting Data
to be used in CFD Analysis |
Haryana Warehousing Corporation, Panchkula, Haryana, India |
2010 |
0.46 |
36
|
CW11288 |
Providing Pre-Bid Engineering Services for Phosphate Slurry
Pipeline in Morocco |
MECON Limited, New Delhi, India |
2010 |
9 |
37
|
CW11228 |
Development of Quality Assurance Plan by Expert Advice for
Various Works |
Municipal Corporation of Delhi, India |
2010 |
16.13 |
38
|
CW10745 |
Bouyancy Calculation for Saltpan Area |
Jaihind Projects Limited, India |
2009 |
1 |
39
|
CW10729 |
Study Report Regarding Use of Galvalume Sheets |
Haryana Warehousing Corporation, Panchkula, Haryana |
2009 |
1.35 |
40
|
CW10615 |
Development of Slurry Pipeline Software |
JGC Corporation, Japan |
2009 |
1.24 |
41
|
CW10527 |
Vetting of Design of RCC Structure of Godown |
Haryana Warehousing Corporation, Panchkula, Haryana |
2009 |
0.25 |
42
|
CW10478 |
Basic Design of Tailing Pipeline |
Tractebel Engineering, New Delhi, India |
2008 |
2.5 |
43
|
CW10461 |
Testing & Analysis of Tailing Material of Iron Ore Slurry |
Tractebel Engineering, New Delhi, India |
2008 |
1.5 |
44
|
CW08606 |
Water Hammer Analysis of Penstock Works for Salma Dam Project, Afganistan |
Angelique International Limited, India |
2006 |
0.5 |
45
|
VNIT5 |
Hydraulic Modelling of 44 villages Water Supply System in Chandwad, Nashik (Maharashtra) |
Maharashtra Jeevan Pradhikaran, Nashik |
2000 |
0.44 |
46
|
VNIT4 |
Proposed Position of Air Valves, Scour Valves and Butterfly
Valves on Pumping Main (Karajkheda Lift Irrigation
Scheme) |
S.E., Karajkheda Lift Irrigation
Scheme |
2000 |
0.025 |
47
|
VNIT3 |
Water Hammer Analysis for Pumping Main of Sondhyatola
Lift Irrigation Scheme |
S.E., Sondhyatola Lift Irrigation
Scheme |
1999 |
0.1 |
48
|
VNIT2 |
Water Hammer Analysis for Pumping Main of Karajkheda
Lift Irrigation Scheme |
S.E., Karajkheda Lift Irrigation
Scheme |
1999 |
0.1 |
49
|
VNIT1 |
Testing / Verification of C.I. pipe bends and joints as per IS:
1729 - 1979 |
Nagpur Engineers Company Limited |
1997 |
0.44 |
Total |
206.455 |
3 (As Co-Consultancy Incharge)
S.No. |
Project No. |
Project Title |
Sponsoring Agency |
Year |
Amount (Lakh Rs.) |
1 |
CW12327 |
Preparation of Master Plan of Drainage for NCD of Delhi |
Irrigation & Flood Control Department, GNCTD, Delhi |
2012 |
80 |
2 |
CW11493 |
Water Balance Study of Vembanad Wet
Land System |
Water Resources(Inter State Water Cell)
Deptt., India |
2010 |
64.24 |
3 |
CW08744 |
Water Supply Project (50 Cusec) and Environmental Evaluation:
Financial Checking |
New Okhla Industrial Development Authority, India |
2006 |
11.6 |
Total |
155.84 |